Mechanical equipment for WWTPs

Mechanical equipment for WWTPs

Besides complex execution of WWTP we also provide supplies of individual machinery and equipment for wastewater treatment plants and water treatment plants.

What equipment do we supply?

  • Mechanical/technological equipment for rectangular sedimentation tanks
  • Mechanical/technological equipment for circular sedimentation tanks&

Latest news

16.8.2019

Wastewater treatment plant intensification in PIKA Bzenec (CZ) factory

A new IC reactor start-up is planned in PIKA Bzenec cannery in August. The factory is increasing production and the hydraulic loading at WWTP is increasing, too. That is why the customer has decided to intensify their plant, which will include extending the existing anaerobic volume with a new same size IC reactor. Part of the intensification will be the installation of more powerful pumps for IC, new biogas treatment ( gasholder with flare for burning excess biogas), increasing of NaOH preparation unit capacity, waste air treatment and new aeration system in the post-aeration tanks. The WWTP capacity will increase from 733 to 1 100 m3/d. Mass loading will change from 5 000 to 7 500 kg/d with 85 % efficiency of COD removal.

7.8.2019

Wastewater treatment pilot plant for industrial waste water

For several months, Hydrotech has intensively dealt with pilot plant testing of food industry waste water with high concentrations of organic compounds (COD), sulphur and dissolved inorganic salts. In the first phase, aerobic bacteria were applied so oxygen was needed for them to be able to treat them. After several important adjustments of technology, the process began to work perfectly and the system treats the waste water not exceeding required limits. In the second phase, Hydrotech made a decision to try to treat waste water in anaerobic way. The high loaded IC reactor parameters and treating limits are determined by gradual system loading. Pilot testing results seem very promising, so far.

22.7.2019

The assembly team has travelled across the Atlantic

A waste water treatment plant construction process in North Dakota for an emerging distillery has reached the point when assembly could begin. The team of Hydrotech´s employees with a chief fitter and technologist left company´s headquarters in Vinosady, Slovakia and started to work on assembly in the USA. The current situation is favourable – the high loaded anaerobic IC reactor has been almost completely finished, as well as the flotation unit for removal of aerobic sludge and the sieve for bigger particles removal at the WWTP inlet.

Enviral
Leopoldov
Moscow Brewing company
Armstrong
Yelabuga
Enviral
Leopoldov

Industrial and sewage / Biofuels

READ MORE
Moscow Brewing company

Industrial / Brewery

READ MORE
Armstrong
Yelabuga

Industrial / Mineral fiber production

READ MORE