Blog

Progress of the WWTP construction in North Dakota in the U.S.

Our employees came back to Slovakia at the beginning of the December who had finished part of their works in North Dakota, USA. They completed works regarding the wastewater treatment plant especially the high-loaded IC reactor during their stay. In addition, they removed remaining, unused material from the reactor bottom area to be able to seal the reactor´s top. One of the latest tasks was the completion of the odor removal system from wastewater treatment plant´s tanks. At the end of their visit, the pipeline for pH adjustment was installed and pressure tests were carried out.

More articles

Read more

Planet Earth pays too much for cheap apparel. Clothes can in fact also be colored ecologically

26.3.2018

It is striking that up to 20% of industrial water pollution in China comes from dyeing or coloring textiles.

Read more

Thousands of ships fitted with ‘cheat water treatment devices‘ cause ocean pollution and violate emissions regulations

21.12.2019

All ships are required to reduce air pollution by using cleaner fuel by 2020. The owners started to adjust; however, not as expected.