Blog

Few weeks of the wastewater treatment plant operation in RAJO - Bratislava dairy

To help our customer with the wastewater treatment plant operation, Hydrotech ensured daily presence of its technologist at the WWTP for a couple of weeks. We operated the plant as it was our own. The main aim was to fine-tune process technology and it´s operation so that effluent limits of treated water were not exceeded. The second part consisted of taking care of the WWTP operational space, to keep it clean and safe. The third point of our action was to optimise chemical dosage into the system. After several weeks of our technologists’ work, we can be proud of this well-functioning WWTP.

More articles

Read more

Meat processing and wastewater treatment - example of a treatment plant 1

30.7.2020

The wastewater treatment plant for a customer producing fresh processed meat, smoked products and specialties of cold and hot cuisine is being...