From pilot test to WWTP implementation
A model example of the design and gradual implementation of pre-treatment of industrial wastewater is a project for treatment of wastewater from textile industry. It is a production of textiles used mainly for hot air balloons. Most of the pollution comes from the dyeing line. The beginning of this project consisted of pilot tests of wastewater treatment using flotation, which lasted roughly 2 months. During this period the ability to remove pollution with such technology was demonstrated, so the customer ordered a proven solution.